Hello,
I am Attempting to Assign materials to components in routing.
Program in use
object 0170
method 0002
t-code ca02
OSS note 313897 has been applied
I have created 2 files one header and one detail for the data and execute the batch program to change.
the error I receive is
C\ 045 V
You cannot edit the task list object with activity type V
I have read in the blogs and they have lead me to OSS note 313897 which has been applied to the system already, I still get the error.
My files include the following.
header:
MATNR
WERKS
PLNTY
PLNNR
PLNAL
Detail:
PLNNR not used in mapping
PLNAL
PLNFL constant '00000'
VORNR
STLTY
STLNR
MATNR main material in routing, I have used the BOM matnr in case this was the field.
WERKS
BOMAT
I still get the errors. I did use 001 but to no avail and I did read 0001 was for creation ONLY
BTW: I did complete a recording for the task but it does take too long this is why I am looking into the batch input methods.