I have done a significant search on this topic so far, without a satisfactory answer.
I have to modify an existing Copying Requirement for a dlivery document to a billing document. This particular requirement is used by several other routines so I need to check which one was the trigger before executing the new code.
My question is if there is a global variable or structure that can be read that can identify the destination billing type at the time of execution?
I could read the Billing Copying Control table (TVCPF) based on the copy requirment number and the source delivery type but want to be sure there isn't a better way to do this check.
thank you in advance.
Justin Loranger